Skip to main content
Placeholder image for Tower Bridge Care Centre
Tower Bridge Care CentreSouthwark

Illustrative image. Photographs of this home have not yet been added.

Rated:Requires ImprovementNursing

Tower Bridge Care Centre

1 Aberdour Street, Southwark, London, SE1 4SH
02073946840
Care Type

Nursing Care

Assessment date

16 April 2025

Provider

Agincare (Southwark) Limited

Beds

126 beds

About Tower Bridge Care Centre

Tower Bridge Care Centre is a nursing home located on Aberdour Street in Southwark, south London, providing care for 122 residents. The home caters to older people, younger adults, and those living with dementia. It is operated by Agincare (Southwark) Limited.

The Care Quality Commission last inspected the home on 8 August 2025, when it was rated as Requiring Improvement. The centre's proximity to Tower Bridge and the Southwark area means residents benefit from a central London location with access to local amenities and transport links. As a nursing home, it provides medical care alongside personal support services tailored to individual resident needs.

Specialist Care

DementiaOlder peopleYounger adults

Fees and availability

We have not verified a current weekly fee for this home. Ask for a written quote based on the room and care needed, including any extra charges.

Check current vacancies, the admission assessment and visiting arrangements directly with the home.

Care and inspection details

Checked against the CQC register on 21 September 2026. This is a check of published information, not a visit to the home.

Registered service
Care home service with nursing
Registered capacity
126 places — this is not a vacancy count
Registration checked
Registered · SE1 4SH

Registered care categories

Caring for adults over 65 yrs; Caring for adults under 65 yrs; Dementia.

These describe the registration. The home must assess whether it can meet the individual person's needs and whether a place is available.

CQC ratings in more detail

Overall rating shown by CQC: Requires Improvement.

Assessment published 8 August 2025. Assessment date recorded: 16 April 2025.

Read CQC's assessment overview

The following is CQC's published account of its assessment, published 8 August 2025. References to “we” mean CQC. It describes findings at that time.

Date of inspection: 29 April 2025 – 10 June 2025. Tower Bridge Care Centre is a residential home with nursing, providing support to adults over 65 years, adults under 65 years, people living with dementia and mental health support needs. At the time of the inspection there were 112 people using the service. There was a registered manager in post at the time of the inspection.

The inspection was prompted in part by notification of an incident following which a person using the service died. This incident is subject to further investigation by CQC as to whether any regulatory action should be taken. As a result, this inspection did not examine the circumstances of the incident.However, the information shared with CQC about the incident indicated potential concerns about the management of risk of safe care and treatment. This inspection examined both those risks.

Tower Bridge Care Centre was taken over by a new provider on 3 October 2024. This is the first inspection of the Tower Bridge Care Centre since the new provider had started running the service.

The service had an ongoing issue with mice in the building. They were working with pest control services to try and resolve the issue, however interventions from pest control were not enough to affectively monitor and resolve the issue.The service was in breach of legal regulation in relation to infection prevention and control, and good governance.

The service had enough staff employed to keep people safe. Pre-employment checks for care staff were completed safely. Staff received an induction at the beginning of their employment as well as regular training and appraisals. Staff completed refresher training for mandatory courses annually.People had care plans in place which documented their care needs. We found some care plans did not have information about people’s protected characteristics. Some care plans did not have adequate risk assessments for people living with conditions such as diabetes, and epilepsy. This was discussed with the management team. The risk assessments we looked at were quickly updated and we saw evidence to support this.The service managed people’s medicines using an electronic system which reduced the risk of medicine administration errors.The service had a range of policies and procedures in place for staff to follow to work towards keeping people safe and keeping the service running smoothly.

We have asked the provider for an action plan in response to the concerns found at this assessment.

Safe
Requires Improvement
Effective
Good
Caring
Requires Improvement
Responsive
Good
Well-led
Requires Improvement

Questions prompted by these ratings

  • Safe: What changes have been made to medicines, staffing and safeguarding since this rating?
  • Caring: How do staff protect privacy, dignity and each person’s choices?
  • Well-led: What has changed in management, checks and oversight since this rating?

These are questions for your visit, not a claim about conditions today.

Read Tower Bridge Care Centre's CQC record and reports.

Contains Care Quality Commission information under the Open Government Licence v3.0. Ratings and registration details can change after the date checked.

5 Questions to Ask on Your Visit

When visiting Tower Bridge Care Centre, consider asking...

  1. 1.What specific dementia training do staff receive and how recently?
  2. 2.How do you support a resident who becomes distressed or confused?
  3. 3.How does the home keep a record of a resident's life history and personal preferences?
  4. 4.How do you involve families as dementia progresses and communication becomes harder?
  5. 5.What happens when a resident's dementia reaches an advanced stage?

5 Things to Look For on Your Visit

When you visit Tower Bridge Care Centre, look out for...

  1. 1.Is the environment calm, uncluttered and easy to navigate?
  2. 2.Do staff speak to residents with patience and dignity, even if they repeat themselves?
  3. 3.Are there memory cues around the home -- photos, familiar objects, clear signage?
  4. 4.Do residents seem settled and safe, or agitated and unsupervised?
  5. 5.Is there meaningful activity happening, or are residents just sitting quietly with nothing to do?

Could the NHS fund Tower Bridge Care Centre's fees?

The average nursing home costs £1,535 per week. That's £79,820 a year. NHS Continuing Healthcare could cover all of it. No means test, no contribution from you.

Location

1 Aberdour Street, Southwark, London, SE1 4SH

CQC Logo

Tower Bridge Care Centre

CQC overall rating

Requires Improvement

Assessment date: 16 April 2025

View full inspection report
New

Have a question about this care home?

Ask in our Community Forum and get a real answer from someone who's been through it.

Share what's on your mind
02073946840